Hog Handling System (Isle Pierre)
IQE Ltd. prepared feasibility studies to determine the best solution for supplying hog fuel to the new Co-gen system constructed at the P.G. Pulp Mill. After reviewing several scenarios involving central hogging, the economics of hogging at several different Canfor sawmill sites, and taking into consideration the transport costs and difficulties, it was concluded that two hog systems would be installed at the Isle Pierre and Polar sawmills. IQE Ltd. assembled concepts layouts with alternative scenarios for discussion, and with Canfor corporate planning, collectively assembled the most optimum / economical plan. IQE Ltd. then proceeded with equipment procurement and detailed civil, structural, and mechanical design.
|